MULTILOAD “CARGO LOADING SEQUENCE WITH REPORT” including “FREE MODE” MORE USEFUL THAN EVER DUE TO
BWM CONVENTION RATIFICATION
BWTS will prolong the ballasting – de-ballasting time, an increase, which may not be acceptable to many bulk carrier terminals.
In such cases, this Multiload Option “Cargo Loading Sequence with report” including “Free Mode” method is a total solution to the requirement for Bulk Carriers to prepare a Loading or Unloading Plan before arriving to the Terminal (as per Common Structural Rules Chapter 4, Section 8, par. 2.1.2, where the Loading / Unloading Sequence is to be agreed with the terminal on the basis of achievable rates of change of ballast). terminal marineindustry planning maritime shipping vessels ballasts unloading sequencing regulations
Email: sales@smmnet.co.uk
Web: https://lnkd.in/gTsDEbK
Eshop: https://lnkd.in/gH944AV
BWM CONVENTION RATIFICATION
BWTS will prolong the ballasting – de-ballasting time, an increase, which may not be acceptable to many bulk carrier terminals.
In such cases, this Multiload Option “Cargo Loading Sequence with report” including “Free Mode” method is a total solution to the requirement for Bulk Carriers to prepare a Loading or Unloading Plan before arriving to the Terminal (as per Common Structural Rules Chapter 4, Section 8, par. 2.1.2, where the Loading / Unloading Sequence is to be agreed with the terminal on the basis of achievable rates of change of ballast). terminal marineindustry planning maritime shipping vessels ballasts unloading sequencing regulations
Email: sales@smmnet.co.uk
Web: https://lnkd.in/gTsDEbK
Eshop: https://lnkd.in/gH944AV
Comments
Post a Comment